Engineering Project Details

Phase: Construction

Project Manager:
Jeremy Mitchler, P.E.

Contact Email:
jnmitchler@chathamcounty.org


Documents

PIOH Concept.pdf
Driving a Roundabout.pdf





The existing intersection at LaRoche Avenue and Jasmine Avenue is signalized with skewed alignments and within 60 feet of a stop-controlled intersection at Livingston Avenue.  This scenario is inefficient and does not meet current transportation safety standards.  The intersections are proposed to be reconstructed as a single-lane, five-leg roundabout.  Based on an operational analysis in accordance with State guidelines, a roundabout is the recommended solution.

A construction contract was awarded to Preferred Materials, Inc. Construction is underway and anticipated to be complete in October, 2019.

 

Informational Video:

https://youtu.be/L6uYbj7Gtyo