Engineering Project Details

Phase: Construction

Project Manager:
Jeremy Mitchler, EIT, LSIT

Contact Email:
jnmitchler@chathamcounty.org


Documents

Canebrake Conceptual Layout.pdf






Canebrake Road is an existing two-lane roadway with 10’ lanes. This project will widen the roadway by increasing the lane widths to 11’, as well as add a 5’ sidewalk on the north side and a 10’ shared use path on the south side. Project will include drainage and water quality improvements.  Construction is now underway and is anticipated to be complete by May of 2019.